No products found
A milking parlor building needs to fit the equipment layout and cow circulation plan. Define the operating area, waiting space, service access and cleaning routes before selecting structural dimensions. The steel building and milking system have separate coordination requirements.
Provide YIZO Steel with supplier drawings, clearances and equipment-support loads for review. Ventilation, drainage and service openings should be agreed with the wider dairy design team.
Include the project location, dimensions and enclosure requirements. Confirm the building components, drawings and installation guidance included in the package. Identify the equipment and site works handled by other project participants.